45 OIL BLOCKS FOR AI OPTIMISATION = PROFITABLE DECARBONISATION
The most sustainable private energy company in Africa.
​
Producing assets
3D seismic survey
​

FLARE GAS CAPTURE = PROFITABLE DECARBONISATION
​
$30 billion of flared gas per year will be used as feed stock for:
​
Raw flared gas to:
-
Propane gas
-
Methane gas
-
Ethane gas will power the processing unit
​
Flare gas capture and processing systems turn raw associated and non-associated gas and oil
tank vapours from waste streams into resources.
​
$30 million investment
10X returns
​

NATURAL GAS = PROFITABLE DECARBONISATION
Natural gas from West Africa will be converted into LNG for shipment by LNG carrier to markets in Europe and Asia where it will be degasified and
distributed.
​
LNG Facility
• Feed gas receiving equipment
• Natural gas treatment equipment to remove impurities (CO2, H2S, mercury and natural gas liquids(NGLs)) from feed gas
• Storage tanks and infrastructure for staging and loading of NGLs
• Liquefaction refrigerant storage
• Four 5 mtpa to 6 mtpa liquefaction trains with gas turbine-driven compressors
• Up to three 180,000 m3 LNG storage tanks
• Flare system
• Continuously manned control room
​
Marine Terminal
A conventional trestle
• Loading and offloading arms and associated infrastructure
• Up to three LNG carrier berths
• Cryogenic rundown and vapour return pipelines between the LNG facility and marine terminal
• Possible loading of NGL
​
Off-take agreement in place.
​

THIRD LARGEST OIL BLOCK IN THE WORLD FOR AI OPTIMISATION = PROFITABLE DECARBONISATION
​
-
>$250 billion USD worth of crude oil resources.
-
2.2 TCF of proven gas resources.
-
31 oil well production planned
-
Gas extraction
-
We have off take for ALL crude and Gas in place

EKO ATLANTIC CITY=FINANCE CAPITAL OF AFRICA
The head offices of Banks, Multinationals, Oil and Gas, and Telecommunication companies in the world will be located there.
​
Made up of Seven District:
-
Harbour Lights
-
Business District
-
Marina
-
Downtown
-
Avenues
-
The Drive
-
Ocean Front
​
A residential complex of reclaimed land of approximately 1.8 million m2
​
250,000 residents, and 200,000 commuters flowing daily to the island
Bringing the rest of the world to Africa
London - Canary Wharf
New York - Wall Street
UAE - DIFC
Singapore - Raffles Place
Zurich - Paradeplatz Square
Hong Kong - Central
Tokyo - Chiyoda
​
29 stock exchanges in Africa, representing 38 nations' capital markets.

CRUDE OIL REFINERY
Land size - 96Acres
Fully permitted:
-
Approval to construct
-
Government Feedstock Allocation Letter for up to 100,000 BPD Crude Oil Refinery
-
Confirmation letter from EPC company to assemble refinery
​

RESP = PROFITABLE DECARBONISATION
Product introduction made available by Strategic Partner
​
This lifting method has completely changed the way that the beam pumping unit has been used for a hundred years to pump oil.
The ground equipment only has a wellhead and a control cabinet, covering an area of only 5 square meters.
This RESP product has a dead weight of one ton. Compared with the 12-type beam pumping unit, each unit saves 30 tons of steel.
The oil does not come into contact with the outside world and is directly incorporated into the pipeline network to completely realize environmentally
friendly oil production.
Renewable Energy – integrated alongside oil & gas = reduced carbon footprint, and standalone strategic locations
>1,000GW total power potential
- feed into local grids for sustainable energy supply beyond petroleum
- convert engineered excess power into green hydrogen underpinned by offtake EOI’s for piping to Europe & shipping ammonia to Strategic
Partners.

GAS PIPELINE = PROFITABLE DECARBONISATION

The pipeline will export up to 40 bcm (billion cubic meters) per year.
​
Total length 5,600km
​
From West Africa to European domestic grid
to supply off takers.
​
$348 billion worth of natural gas per year.
​
Pipe Infrastructure
* Gas supply infrastructure and smart pig launching facilities at the originating Terminal.
* Valve stations
* A cathodic protection (CP) system
* A fibre optic communications system
* A computer-based control system
​

LNG PLANT = PROFITABLE DECARBONISATION
Features of the Plant
-
Built on a reclaimed land measuring 2.27 Sq km.
* There are 6 main dedicated transmission gaslines; four of which are
located onshore.
* It has 4 LNG storage tanks with a capacity of 84,200 cubic metre.
* It has a fractionation plant for processing liquefied petroleum gas.
* The plant has common condensate stabilization.
* It has three condensate storage tanks with a capacity of 36, 000
cubic meter.
* It has 4 LPG storage tanks with a total capacity of 65,000 cubic
meter.
* It has 10 installed turbine generators with a total capacity of 325
MW.
* It has two export lines for liquefied natural gas.
* There are 24 ships present in the plant for transporting the LPG.
* There is a material offloading jetty and a passenger jetty.
* A residential area measuring 2 Sq Km was built for its staff.
​

The annual capacity of the 40" pipeline would be up to 30 billion cubic meters of natural gas.
​
4,128km in total length
​
From West Africa to European domestic grid
to supply off takers.
Pipe Infrastructure
-
Gas supply infrastructure and smart pig launching facilities at the originating Terminal.
-
Valve stations
-
A cathodic protection (CP) system
-
A fibre optic communications system
-
A computer-based control system
​
$261 billion worth of natural gas per year.


.

250,000 Tn per month South America
1.6 TCF per year West Africa
​
RENEWABLE ENERGY – integrated alongside oil & gas projects = PROFITABLE DECARBONISATION
>1,000GW total power potential
- feed into local grids for sustainable energy supply beyond petroleum
- convert engineered excess power into green hydrogen underpinned by offtake EOI’s for piping to Europe & shipping ammonia to Strategic Partners